18 years on the tools

Certified AS 3740 waterproofing, done in-house

One trade, one accountability

Free fixed written quote

Pool Tiling and Refurbishment

Pool tiling and refurbishment in Melbourne, the whole job

Pool render, waterproofing, waterline mosaic and tile resurface, all under one trade. Few Melbourne tilers can do the full pool job in-house. We can.

The full pool vertical, in-house

A pool refurbishment is four trades in one: render, waterproofing, waterline tile or mosaic, and tile resurface. Most tilers can do one or two of those. Most pool specialists sub out the rest.

The Zia Tiling team does all four in-house. That means one contractor takes your pool from a tired, dated finish to a fully refurbished pool, and one trade is accountable for the result.

Trade Sec Image

What we refurbish

Pool tiling and resurfacing: a full re-tile or resurface for a pool that has aged out of its finish.

Waterline tiling and mosaic: the band that shows the most wear and the most detail, replaced and finished clean.

Pool waterproofing: the membrane that keeps the structure sound, done to standard.

Pool rendering: the substrate prepared and rendered ready for tile or finish.

Vector 46

Why ageing Melbourne pools need it now

Pools built in the 1990s and 2000s are reaching the end of their finish cycle, usually around 20 years. The waterline lifts, the render cracks, the tiles let go. A refurbishment brings the pool back without the cost of replacing it.

Bathrooms Big and small Sec Image

Pool work travels

Pool refurbishment is the most photogenic work we do. Before and after, waterline mosaic detail, the overhead shot of a finished pool. We document our pool jobs as full case studies.

frequently asked question

Faq Img
Do you do the whole pool, or just the tiles?

The whole pool. Render, waterproofing, waterline mosaic and tile resurface are all done in-house by one trade.

Yes. Waterline tile or mosaic replacement can be done on its own, or as part of a full refurbishment.
It depends on the pool size and condition. We give you a clear timeline with your fixed written quote after we see the pool.

Every pool is different. We give you a free fixed written quote once we have seen the condition of the pool. The price is fixed before work starts.

Pool work runs best in the warmer months, roughly August to February. Book early, because that window fills.

Yes. Pool waterproofing is part of the in-house pool vertical, done to standard.